Wednesday, 30 April 2008

W D MEDWAY II

Heading down the Clyde past Dumbarton Rock this afternoon, the dredger WD MEDWAY II was making her last trip from the upper reaches with spoil for the dumping ground off the mouth of Loch Long, as her charter to Clydeport has finished. During the past month, she has dredged extensively the river itself as well as King George V and Rothesay Docks. She also cleared the river bed at the BAE shipyards.

0 comments: