After spending a few days in drydock on the Mersey at Birkenhead having some repair work carried out, SMIT BARRACUDA was seen returning to Greenock to rejoin the Smit team working on the installation of the Valiant Jetty. As seen previously, she was the tug that brought the barge with the boom extensions used by TAKLIFT 7 during the operation.
Thursday, 28 May 2009
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment