Monday, 25 October 2010

LOCHNEVIS

Nearing the end of her annual overhaul, CalMac's LOCHNEVIS was undergoing boat drill in the James Watt Dock berthed immediately ahead of CORUISK, her Mallaig fleetmate during the summer months. LOCHNEVIS had arrived on the Clyde early on Monday 11th, and been drydocked in the adjacent Garvel Drydock the following day.

0 comments: