Saturday, 3 September 2011

HEBRIDEAN ISLES

Since the introduction of the new Islay ferry FINLAGGAN, the service has been maintained by both the new ship and one of the existing ferries on the crossing between Kennacraig and Port Askaig. With ISLE OF ARRAN on duty, the chance has been taken to take HEBRIDEAN ISLES off service and to update the control systems for her propulsion machinery. This work has been carried out afloat at Garvel, Greenock, and included the replacement of propeller pitch, steering and bow thruster controls with new electronic systems. In the view above, two of the new wiring looms can be seen dangling over the bridge wings before final installation.

0 comments: